How do I size a copper silver ionization system for a point of entry application for 100% incoming water treatment?

You will need to gather following information to properly size a copper silver ionization solution for your point of entry (POE) application. 

  • Size of the POE water line where you want the CSI solution installed,
  • Maximum water flow,
  • Location of the cooling towers makeup water line if present,
  • Expected daily water loads,
  • Determine if you want the CSI system installed “in-line” or “in-parallel” to the incoming water line.

Contact your local representative to receive a complete project submittal package and performance specifications that you can easily integrate into your master specs.