You will need to gather following information to properly size a copper silver ionization solution for your point of entry (POE) application.
- Size of the POE water line where you want the CSI solution installed,
- Maximum water flow,
- Location of the cooling towers makeup water line if present,
- Expected daily water loads,
- Determine if you want the CSI system installed “in-line” or “in-parallel” to the incoming water line.
Contact your local representative to receive a complete project submittal package and performance specifications that you can easily integrate into your master specs.